Concrete is a key material in building strong structures. It gets harder over time as it cures. One big way to check its quality is by testing the compressive strength of concrete at 7 days, 14 days and 28 days. This test shows how much load the concrete can take before it breaks under pressure.
Civil engineers use these tests to make sure designs are safe. Lab technicians run the tests. Project managers watch the results to keep projects on time. Researchers study how concrete gets stronger. Knowing strength at these ages helps everyone in construction.
This guide explains what happens at each stage. It covers how to test it correctly. Good curing in a lab helps get true results.
Why test compressive strength of concrete at 7 days, 14 days and 28 days?
Concrete strength grows as water and cement react. This is called hydration. Most strength comes in the first weeks.
Tests at 7, 14, and 28 days show progress:
- 7-day concrete strength: Shows early gain. Often, 60-70% the final strength.
- 14 days: Usually 80-90% or more.
- 28-day concrete strength: The main benchmark. Specs use this for acceptance.
Standards like ASTM set the 28-day mark as key. Early tests help predict if it will meet goals.
Typical Strength Values
For normal concrete (around 4,000 psi or 28 MPa at 28 days):
- At 7 days: About 65% (2,600 psi).
- At 14 days: About 90% (3,600 psi).
- At 28 days: 100% (4,000 psi).
These are averages. Real values depend on concrete mix design, water ratio, and curing.
High-strength mixes gain faster early on.

How Concrete Strength Develops Over Time
Concrete starts soft. It hardens fast at first.
Cement hydration rate drives this. Water helps cement form strong bonds.
In good conditions:
- First 7 days: Quick rise from hydration.
- 7 to 14 days: Steady growth.
- After 28 days: Slow gain, but can go higher long-term.
Factors like temperature, speed, or slowing it down. Hot weather makes early strength high, but final strength lower if not careful.
Early-Age Concrete Strength Matters
Early-age concrete testing at 7 and 14 days lets teams know if concrete is ready for the next steps. Like removing forms or loading.
It also spots problems early. Low 7-day strength might mean a bad mix or poor curing.
The Compressive Strength Test Step by Step
Labs follow ASTM C39 for testing cylinders.
Here is how it works in simple steps:
- Make cylinders (6×12 inches common) from fresh concrete.
- Cure them right (more on this next).
- Cap ends flat for even load.
- Put in the compressive strength test machine.
- Apply the load slowly until it breaks.
- Calculate strength: Max load divided by area.
Use at least two cylinders per age. Average the results.

Specimen Preparation
A good start is key. Follow ASTM C31 for molding.
- Mix the concrete well.
- Fill molds in layers.
- Compact to remove air.
- Smooth top.
Then cure fast.
The Role of Concrete Curing Process
Curing keeps moisture and the right temperature. This lets hydration go full.
Poor curing means weak concrete. Even a good mix can fail.
Lab vs. Field Curing
Controlled curing environment in labs gives the best results.
Labs keep:
- Temperature: 73°F ± 4°F (23°C ± 2°C).
- Humidity: Over 95%.
This follows ASTM C511.
Field curing copies site conditions. Useful for real in-place strength. But variable weather can lower results.
Lab curing often shows higher strength. Up to 10-20% more than the field.
Best Curing Methods for Accurate Concrete Testing
- Moist rooms or tanks: Keep samples wet.
- Cover with wet burlap early on.
- Use a concrete test chamber for steady temperature and humidity.
Controlled rooms prevent dry-out or freezing.
For reliable compressive strength of concrete at 7 days, 14 days and 28 days, use lab-controlled curing.

Concrete Testing Laboratory Equipment
Good labs need:
- Compressive strength test machine: Strong frame, accurate load.
- Curing tanks or rooms.
- Caps for cylinders.
Modern labs use sensors for real-time watch.
Material Testing Protocols
Follow ASTM standards:
- C31: Making specimens.
- C39: Testing strength.
- C511: Curing setups.
These keep results consistent.
Factors That Affect Strength Gain
Many things change how fast and how much strength grows.
Concrete Mix Design
- Low water-cement ratio: Higher strength.
- Good aggregates: Better bond.
- Additives: Speed or slow hydration.
Temperature and Humidity
High temp early: Fast gain, but possible weak long-term.
Low temp: Slow gain.
High humidity: Keeps moisture for full hydration. Converge.io Blog: Differences in strength between lab-cured concrete and in-situ concrete1
Other Factors
- Cement type.
- Air content.
- Compaction.
Construction Quality Control with Strength Tests
Tests help:
- Accept or reject batches.
- Plan timelines.
- Ensure safety.
Low results? Check curing first.
Use concrete quality control plans.
Common Issues and Tips
- Dry specimens: Low strength.
- Wrong load rate: Bad reads.
- Poor caps: Uneven break.
Tips:
- Store cylinders safely.
- Test on time.
- Record all details.
Advanced Topics: Maturity and In-Place Testing
Maturity method guesses strength from temperature history.
Good for early estimates without breaks.
Sensors in concrete give real data. Darwin Chambers: Material Test / Cure Rooms for precise concrete curing2
Case Examples
In one project, lab-cured cylinders hit 4,500 psi at 28 days. Field-cured only 3,800 psi. The site showed that curing needed to be better.
Controlled chambers fixed it on the next pour.
FAQs
What is the typical 7-day concrete strength?
The typical 7-day concrete strength is about 65% of the full 28-day target strength for normal mixes. This means if your concrete is designed to reach 4,000 psi at 28 days, it usually gets around 2,600 psi after just one week. It shows the concrete is gaining strength quickly at first, but it still needs more time to get much stronger.
Why is 28-day concrete strength the standard?
The 28-day strength is the standard because most concrete mixes reach close to their full strength by then due to hydration. By 28 days, the chemical reaction between cement and water is mostly complete, giving a reliable benchmark for design and safety. Engineers and builders use this number to know the concrete is strong enough for real-world use in buildings and roads.
How to test compressive strength of concrete in a lab?
In a lab, workers make concrete cylinders, usually 6 inches wide and 12 inches tall, right after mixing. They cure the cylinders in water or a moist room at the right temperature to help them harden properly. After 7 or 28 days, they use a special machine to crush the cylinders and measure the force needed to break them, following ASTM C39 rules.
Difference between 7-day and 28-day strength?
The 7-day strength shows early progress and tells if the concrete is on track to reach its full goal. The 28-day strength is much closer to the final strength and is used to decide if the concrete meets the required design level. The 7-day test is like a quick check, while the 28-day test is the main one for approving the mix.
Conclusion
Understanding the compressive strength of concrete at 7 days, 14 days and 28 days is vital for safe, durable builds. Proper testing, especially in controlled curing environment, ensures accurate results. Follow standards, use good equipment, and watch factors like hydration and mix.
This helps meet specs and build trust in concrete performance.